Quick Start
- Edit any value via double clicks
- Values in the metric column must be in the format: metric (lower bound, upper bound)
- To empty a dropdown cell, select the cell, press space, and enter
- Right click on cells (except for the plot cells) to see the menu that allows inserting rows, columns, etc.
Sorting
- Sorting uses the "metric" value (instead of the boundaries)
- The sorting button toggle between ascending and descending upon clicks (initially ascending)
Plots
- Hover over the Plot column to see the specific values in popups
- Hover over the headers of the dropdown columns to see the name in popups
Downloading/Uploading
- For now, you can only download the text/numbers without the plots
- The matrix would be saved as a TSV file. Usage instructions are here
- Note the Plot column must be kept empty
Questions/Contributions
Please contact BU SAIL: hicsail@bu.edu
A | B | C | D | E | F |
---|---|---|---|---|---|
Study | Metric | Plot | Location | GDP | Country |
paper 1 | .5 (0.4, 0.6) | A | I | U | |
paper 2 | .8 (0.5, 1.1) | A | N | U | |
paper 3 | 1.1 (0.75, 1.45) | A | I | U |
Degree of Confound Control
- A: Adequate
- U: Unclear
- I: Inadequate
- U: Unknown
- Invalid Value